This project entailed the construction and installation of 6 washbacks and associated pipework at Blair Athol Distillery.

As the old tun room is a listed building two of the vessels had to be constructed on site with all parts passing through a small doorway.

In addition to the vessels LH Stainless were also responsible for the installation of the support steelwork and flooring